There is a supercharger coming soon to Howell, NJ at 4690 US-9, Howell Township, NJ 07731. I saw that the equipment is already in the parking lot, but its not listed in your website at all. Thanks :slight_smile: Its coming soon in Q1 2023 according to Tesla website.

1 Like

A post was merged into an existing topic: Supercharger - Alcobendas, Spain

Alsfeld, Germany is open

16x V3

2 Likes

thanks @blackmoe. updated Alsfled

1 Like

Thanks but i wrote

sorry updated

1 Like

Öhringen, Germany is open

20x V3 Stalls

2 Likes

Thanks @blackmoe. updated this. appears on teslogger Available SuC Stalls

1 Like

:laughing: :laughing: :laughing::rofl: :rofl: :rofl: :rofl: :rofl: :rofl:
image

So I guess I’m still a liability with a fresh 30 address find? Feels great to be the best :grin: :grin: :grin:

First find once again, in Australia of all places :rofl:

Please correct the position for Merklingen :slight_smile:

1 Like

Limited Hours but 24/7? Can someone explain?

3 Likes

The Supercharger at the Giga Berlin factory/Grünheide Germany is listed as 8 x 150kW and with “Permit”. But in reality it will be 20 V3 stalls with 250kW, and it is being built as we speak. Construction can be seen in one of Tobias Lindhs videos on YouTube: Giga Berlin | 2022-10-23 | Front Casting - YouTube

Thank you for bringing this to our attention.

It’s definitely 24/7.

A little background info: the “hours” field is a free-text field. If left empty, the system automatically displays “24/7”. If, however, one of our editors enters any info in the field, the system assumes that it’s not 24/7 and automatically displays “limited hours”.

In this case, the editor entered “24/7” and the system interpreted this as a “limitation”.

Well spotted.

2 Likes

Oviedo, Spain has 12 Stalls available in the Tesla App

1 Like

Kaunas, Lithuania has been upgraded to 8 V3 stalls (from 3 V3 + 2 V2).

1 Like

Bailly-Romainvilliers, France available in the Tesla App

Kerpen, Germany and Norden, Germany both openend today

1 Like

Thanks @blackmoe added

1 Like

Jettingen, Germany 130kW instead of 120kW