1 Like
It looks like this site has a designated discussion thread here if you want to better keep others updated: https://teslamotorsclub.com/tmc/threads/supercharger-simi-valley-ca-under-construction-may-2020-12-v3-stalls.98028/page-3
Also from that thread, it looks like there’s definitely some more work left with pipes sticking out of the ground, signs, and landscaping. I think the stalls being wrapped up means they haven’t been wired yet either. So maybe a few weeks left before opening (at the minimum).