Is there any news about the Planned Superchargers in Romania?
in particular about Timișoara that is planned Q1 2021 it should be ready by now.
The other locations:
Sibiu Q2 2021
Pitești Q2 2021
Bucharest Q2 2021
Thank you
Is there any news about the Planned Superchargers in Romania?
in particular about Timișoara that is planned Q1 2021 it should be ready by now.
The other locations:
Sibiu Q2 2021
Pitești Q2 2021
Bucharest Q2 2021
Thank you
Timișoara is under construction:
https://twitter.com/ianisciuca/status/1375823278573551619
@MrPlugShare located the address for it:
Bulevardul Revoluției din 1989 Nr.5, Timișoara 300085, Romania
Based on the photo it looks like the coordinates are 45.755056, 21.233111, which is across the street from where Google places that address.
This location is under construction!
Location
Pitesti Retail Park (shopping Mall)
Seems like 8 stalls V3.
Natürlich! 
New construction site in Sibiu:
Coordinates: 45.7761503317386, 24.17184394889236
https://goo.gl/maps/h7p16Fs4d6EbDAC3A
Looks like 6 stalls, @moderators please add it to the database
Thanks, now added!
Find Us now lists Sibiu as open: Sibiu Supercharger | Tesla
A new location has been identified in Oradea. 12x V4
Sources:
Timisoara 2 (Iulius Mall), U/C as we speak. 16 stalls rumored.
Please update the location of Satu Mare. According to this facebook video, the location is at Shopping City.
Exact loaction:
https://maps.app.goo.gl/nyLSMY5PjDj61gnUA?g_st=ipc
Plugshare link:
Hi,
A new location was spotted in Romania → Q3 2025 voting winner Drobeta Turnu Severin.
Screenshot below from Tesla SUC map.
@moderators please add it to the database (at this stage in the middle of the city since no precise location is mentioned on tesla’s site).
thanks.
Supercharger in Iasi is now ‘Under Construction’ according to Tesla Find US: https://www.tesla.com/findus?bounds=47.399381371644125%2C28.16297887304686%2C46.97473391650629%2C26.76496861914061&location=4008272&functionType=winner_supercharger
can someone please update the map?
On Facebook it was reported Drobeta is now under construction.
Aproximate location is parking lot of Shopping Center https://maps.app.goo.gl/dQLFx63hdmqgAjAp7
Judging by the picture, does that mean that everything is already assembled? This is wonderful news, both for Romania and Serbia.
Yes, those are the preassembled 4 stalls palletes. Acording to the comments on that posta, a week ago there was no sign of construction going on. Installation is really fast with this method. Let’s see how long it takes for them to be turned on. For Satu Mare it took almost 5 months after everything was in place for electricity to flow. It probably depends on the local provider, but Tesla is doing a fantastic job with these!