According to this FB post, Haverslev SUC is being expanded with 24 stalls
https://www.facebook.com/groups/ladestatus/permalink/2232586120261204/
According to this FB post, Haverslev SUC is being expanded with 24 stalls
Thanks added a note to that site that an expansion is underway.
Let us know when it opens.
16 new V3 (250 kW) stalls are up running according to both the car and the APP. The car knows that 40 stalls are present but right now only 16 of the new V3’s are powered on. It is expected that the rest of the site will also get power soon enough.