The Grand Geneva Resort & Spa in Lake Geneva, WI, USA is installing a 6 stall Supercharger.
https://goo.gl/maps/6Gt7vhJJhtEgeRrEA
The electrical cabinets are installed on the cement pad and the Supercharger cabinets are on site as of July 1, 2019.
The Grand Geneva Resort & Spa in Lake Geneva, WI, USA is installing a 6 stall Supercharger.
https://goo.gl/maps/6Gt7vhJJhtEgeRrEA
The electrical cabinets are installed on the cement pad and the Supercharger cabinets are on site as of July 1, 2019.
Is it 6 electrical cabinets or stalls, because 6 cabinets = 12 stalls.
It is 6 stalls, looks like Version 2 Superchargers.